Our recent some projects
BTC - Tbilisi Georgia Project
BTC - Tbilisi Georgia Project The water tank working under air pressure and the water tank working in a closed container project feed the fire sprinkler offices. The tank was produced by Tekno Fire and supplied to the British company Petrofac and BP.
PG - Ibadan -Fire Pump Station
PG - Ibadan -Fire Pump Station 20 foot container type diesel engine drive and leak removal fire pump station feeds existing sprinkler fire systems.
Transformer -Georgia
Transformer -Georgia Spray System and Container Deluge Valve and Container Type Fire Pump Project It automatically protects the transformer water-based spray system against fire under pressure by being fed by 2 x 30 foot container type multiple deluge valve stations as well as diesel and electric motor driven fire pumps and leak removal pumps.